Eldridge City Utilities
Municipal utilityIowaWebsite ↗
- Customers (2025)
- 3,016
- Meters
- 2,990
- Smart meters (AMI)
- 0 (0%)
- Radio-read meters (AMR)
- 2,990 (100%)
- EIA utility number
- 5742
Counts: EIA Form 861, data year 2025 (short form: small utilities report customers but not meter types).
Meters installed
Tantalus SystemsPilot
since 2026 · Pilot [source, unverified]
Tantalus Systems AMI proposal (2025-09-10) through meter vendor Van Wert; Option A retrofits existing electric meters with communication modules and activates water endpoints. CivicIQ (secondary): board approved Proposal 3b, Van Wert AMI pilot phase, $3,500 (July 2026). Network not named. Re-checked 2026-11-16: Eldridge Utility Board minutes 2026-07-21 (read) confirm the AMI Metering project: Van Wert says the meters are ready, software implementation and a cellular collar for data collection being configured, deployment tentatively mid-August 2026. Minutes do not name the platform; Tantalus rests on the Sept 2025 proposal in the Feb 2026 packet (search snippet; packet too large to fetch). Install not confirmed.
Itron, Inc.· Itron ChoiceConnect mobile / handheld AMR (MC3/MC4, FC300, Itron Mobile Radio)Current
Drive-by AMR · 3,001 meters [source, unverified]
Eldridge June 2026 board packet: 3,001 electric meters all on aging AMR (drive-by), no AMI. Itron named via a 2025 agenda item (Itron AMR system upgrade, Temetra meter reading software, search snippet); endpoint model not stated. Re-checked 2026-11-16: Feb 2026 staff memo (search snippet) repeats 3,001 electric meters on aging drive-by AMR; Itron still only from a snippet (packets too large to fetch).
Getting your usage data
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- Not stated
- Smart meter opt-out
- Not stated
- Research
- Researched [source, unverified]
Eldridge Electric & Water Utility. June 2026 board packet: all 3,001 electric meters on aging drive-by AMR, no AMI. 2025 agenda listed an Itron AMR system upgrade (Itron Temetra meter reading software); Tantalus AMI proposal (Sept 2025, via meter vendor Van Wert) under discussion and a Van Wert AMI pilot phase ($3,500) approved July 2026 per CivicIQ. ERT broadcast likely if the endpoints are Itron ERTs, but no source names the endpoint, so not_stated. No usage portal found. Re-checked 2026-11-16: July 21 2026 utility board minutes say AMI meters (Van Wert) ready, cellular collar for data collection, deployment tentatively mid-August 2026; no portal named.
Meter types over time
Counties served
Iowa: Scott
EIA lists a county when the utility serves any part of it.