Commonwealth Edison Co
Investor-owned utilityIllinoisWebsite ↗
- Customers (2025)
- 4,158,413
- Meters
- 4,362,499
- Smart meters (AMI)
- 4,358,494 (100%)
- Meters with a home-area network
- 4,358,494
- Grid region
- RFC · PJM
- EIA utility number
- 4110
Counts: EIA Form 861, data year 2025.
Meters installed
Itron, Inc.· Itron network Gen4/Gen5/Gen6 (Silver Spring mesh heritage, UtilityIQ)· meters by GE Meters (GE Grid Solutions electricity meters)Current
RF mesh · since 2013 · 4,000,000 meters [source]
EIMA AMI Implementation Plan (ICC Docket 12-0298, accelerated plan): Silver Spring Networks IPv6 mesh (Itron since 2018) for AMI, DA and smart streetlights; Itron case study: >4 million smart meters installed by end of 2018, three years ahead of the original 2021 schedule. Meters: GE ~$200M deal for ~4 million smart meters 2013-2021 (GE release 2013-07-09); model not named (GE I-210+c with Silver Spring NIC is likely, not confirmed). Peoples Gas and North Shore Gas gas endpoints also report over this network (see seed/gas/utilities/IL-1).
Silver Spring Networks· Itron network Gen4/Gen5/Gen6 (Silver Spring mesh heritage, UtilityIQ)Replaced
RF mesh · since 2009 · 131,000 meters · Pilot [source]
ComEd AMI pilot (EIMA predecessor, ICC-approved 2009): Silver Spring (now Itron) two-way network integrated into GE and Landis+Gyr meters, about 131,000 meters in Chicago and suburbs (press at the time said ~141,000). Absorbed into the systemwide rollout; meter_vendor left blank because two makers.
Getting your usage data
- Interval you can see
- 30 minutes
- Available
- Next day
- Green Button
- Download and Connect My Data
- Pair a device to the meter
- Available (Rainforest Automation EAGLE (per a 2015 customer forum))
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Allowed, with a fee ($21.53)
- Research
- Researched [source]
ComEd Data Platform Requirements (ICC P2022-0486, quoted in a NARUC July 2025 deck): customer interval data in 30-minute intervals, refreshed daily, 24 months, dashboard + download + API, Green Button standard. ComEd joined Green Button in 2012; ICC approved its Green Button Connect filing (Docket 14-0507) and the 15-0073 authorization order. My Account usage page URL not confirmed (site JS-only), so portal_url blank. HAN: EIA reports all AMI meters HAN-enabled; a 2015 RRTP forum says ComEd supported smart meter connected devices (Rainforest), current program not confirmed. Opt-out: $21.53/month Smart Meter Refusal Charge (Rider NAM, Docket 13-0552; Wade v. ICC). Silver Spring/Itron mesh, no ERT broadcast. UtilityAPI coverage not checkable. Re-checked 2026-11-16: ICC press release (2014-02-06, search snippet of icc.illinois.gov) confirms the $21.53/month non-AMI customer charge under Rider NAM; 30-min interval stays from the ICC data platform requirements (NARUC deck); HAN devices still forum-sourced only. A third-party guide says 15-minute data (not adopted).
- Pair a Zigbee energy monitor →
- About Green Button →
- Read the meter's test LED →
- Illinois data access rules →
Meter types over time
Counties served
Illinois: Boone, Bureau, Carroll, Cook, DeKalb, DuPage, Ford, Grundy, Jo Daviess, Kane, Kankakee, Kendall, LaSalle, Lake, Lee, Livingston, Marshall, McHenry, Ogle, Stephenson, Whiteside, Will, Winnebago, Woodford
EIA lists a county when the utility serves any part of it.