Rochester Public Utilities
Municipal utilityMinnesotaWebsite ↗
- Customers (2025)
- 60,963
- Meters
- 60,963
- Smart meters (AMI)
- 0 (0%)
- Radio-read meters (AMR)
- 60,867 (100%)
- Grid region
- MRO · MISO
- EIA utility number
- 16181
Counts: EIA Form 861, data year 2025.
Meters installed
Itron, Inc.· Itron network Gen4/Gen5/Gen6 (Silver Spring mesh heritage, UtilityIQ)Rolling out
RF mesh · since 2026 · 60,000 meters [source, unverified]
Rochester Public Utilities Advanced Metering Project: AMI, MDM and meter installation procured separately; about 60,000 electric and 40,000 water endpoints over three years (April 2025 project update, search snippet: Itron functional testing, Itron Gen 5 electric meter firmware, 500W water endpoints, Diehl water meters). RPU news (2026-07-01): electric installs began June 1 in northwest Rochester, region by region over several years. Itron role from snippets only. Re-checked 2026-11-16: no primary page naming Itron could be read (cms.cws.net, which hosts the April 2025 project update PDF and the AMR opt-out FAQ, did not resolve; RPU pages and KROC News name no vendor; rollout quadrant by quadrant NW, NE, SE, SW over several years; future customer portal).
Vendor not knownCurrent
[source, unverified]
RPU AMR Opt Out FAQ (search snippet): current meters are AMR, opt-out has a one-time $200 setup fee per electric meter. Vendor and technology not stated; being replaced by the Itron AMI project from 2026. Re-checked 2026-11-16: no primary page naming Itron could be read (cms.cws.net, which hosts the April 2025 project update PDF and the AMR opt-out FAQ, did not resolve; RPU pages and KROC News name no vendor; rollout quadrant by quadrant NW, NE, SE, SW over several years; future customer portal).
Getting your usage data
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- Not stated
- Smart meter opt-out
- Allowed, with a fee ($200)
- Research
- Researched [source, unverified]
Rochester Public Utilities. Itron AMI installs from June 2026; RPU says enhanced customer usage tools come in the future (no usage portal described). Current AMR opt-out (search snippet of RPU AMR Opt Out FAQ): one-time $200 setup fee per electric meter (monthly charge, if any, not seen). Re-checked 2026-11-16: no primary page naming Itron could be read (cms.cws.net, which hosts the April 2025 project update PDF and the AMR opt-out FAQ, did not resolve; RPU pages and KROC News name no vendor; rollout quadrant by quadrant NW, NE, SE, SW over several years; future customer portal).
Meter types over time
Counties served
Minnesota: Olmsted
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.