Central Lincoln People's Ut Dt
Public power districtOregonWebsite ↗
- Customers (2025)
- 41,745
- Meters
- 41,744
- Smart meters (AMI)
- 41,725 (100%)
- Grid region
- WECC
- EIA utility number
- 3264
Counts: EIA Form 861, data year 2025.
Meters installed
Landis+Gyr· Landis+Gyr Gridstream RF (Gridstream Connect RF mesh)Current
RF mesh · 2011–2012 · 38,620 meters [source]
Smart Grid Team 2020 (SGIG): Central Lincoln picked Landis+Gyr Gridstream RF mesh after reviewing competing RF and PLC systems, with deployment January 2011 to June 2012 (L+G release). The DOE 2014 summary gives 38,620 meters system-wide, RF mesh plus fiber backhaul, residential meters with remote disconnect and wireless HAN capability, 46 in-home displays and a customer web portal with interval data. Meter model not stated.
Getting your usage data
- Online account
- clpud.smarthub.coop
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Allowed, with a fee
- Research
- Researched [source, unverified]
NISC SmartHub (new Energy Insights June 2026). SGIG 2014: a customer web portal shows interval usage data; residential Gridstream meters have wireless HAN capability, and 46 in-home displays were deployed, with no current HAN program found. The customer service policy definitions list a manual meter read fee for customers who opted out of automatic meter reading; amount not found. Re-checked 2026-11-16: no primary source found for the opt-out fee amount or portal interval (looked: search for clpud fee schedule; the $25 AMI opt-out results are Lewis County PUD (lcpud.org), not Central Lincoln).
Meter types over time
Counties served
Oregon: Coos, Douglas, Lane, Lincoln
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.