Bolivar Energy Authority

Municipal utilityTennesseeWebsite ↗

Customers (2025)
11,441
Meters
11,441
Smart meters (AMI)
11,441 (100%)
Customers with daily online usage
11,441
Grid region
SERC
EIA utility number
1936

Counts: EIA Form 861, data year 2025.

Meters installed

Tantalus Systems· Tantalus TRUConnect AMI (Tantalus Grid Modernization Platform)· meters by Itron, Inc.Current

Tower-based RF · 2024–2025 · 11,000 meters [source]

Tantalus selected via Dec 2023 RFP (Irby Group): Itron meters with integrated Tantalus modules talk to ~300 battery-free TRUSense Fiber Gateways (socket devices, avg 1:40) backhauled over BEA's fiber; testing Aug 2024, full deployment Sept 2024 - May 2025, over 11,000 meters; hosted head end. comm_tech follows the network catalog row; the WAN here is fiber.

Elster Solutions· Elster / Honeywell EnergyAxis (EA_MS)Replaced

RF mesh · 2011–2025 [source]

Elster EnergyAxis AMI and Elster smart meters selected Nov 2011 ($2.7M per a search snippet), completion targeted Sept 2012; CalAmp WAN routers (Jan 2012). Replaced by the Tantalus system 2024-2025 (Tantalus: replaced meter-to-collector-to-tower backhaul); end_year from that replacement.

Getting your usage data

Green Button
Not stated
Pair a device to the meter
Not stated
Meter radio readable with an SDR
No
Smart meter opt-out
Not stated
Research
Researched [source]

Bolivar Energy Authority (TN; separate from the City of Bolivar gas/water utility). Site had an expired TLS certificate, so no portal checked. About 1,440 prepay customers (Tantalus case study). Tantalus-equipped Itron AMI meters on fiber gateways (ert_broadcast no inferred from the AMI modules). Tennessee has no opt-out rule (state policy).

Meter types over time

0%50%100%2013: AMI 100%, AMR 0% of 11,105 meters'132014: AMI 100%, AMR 0% of 11,025 meters'142015: AMI 100%, AMR 0% of 11,113 meters'152016: AMI 100%, AMR 0% of 11,013 meters'162017: AMI 100%, AMR 0% of 11,083 meters'172018: AMI 100%, AMR 0% of 11,038 meters'182019: AMI 100%, AMR 0% of 11,058 meters'192020: AMI 100%, AMR 0% of 11,246 meters'202021: AMI 100%, AMR 0% of 11,312 meters'212022: AMI 100%, AMR 0% of 11,311 meters'222023: AMI 100%, AMR 0% of 11,361 meters'232024: AMI 100%, AMR 0% of 11,449 meters'242025: AMI 100%, AMR 0% of 11,441 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersBolivar Energy Authority. Source: EIA Form 861.

Counties served

Tennessee: Fayette, Hardeman

EIA lists a county when the utility serves any part of it.