McMinnville Electric System
Municipal utilityTennessee
- Customers (2025)
- 8,370
- Meters
- 8,430
- Smart meters (AMI)
- 8,427 (100%)
- Grid region
- SERC
- EIA utility number
- 12186
Counts: EIA Form 861, data year 2025.
Meters installed
Nexgrid· Nexgrid ecoNet / Plexus smart grid network (ecoOne head end)Current
RF mesh · since 2011 · Commercial [source, unverified]
2011 press release (search snippet): McMinnville Electric System (MES, TN; Rodney Boyd quoted) awarded Nexgrid a contract for commercial and industrial smart grid infrastructure after a pilot. Network family (ecoNet) inferred from the vendor, not named in the snippet. Whether Nexgrid also covers residential meters, and whether the system is still in service, not found. Not McMinnville (OR) Water & Light. EIA reports AMI since 2013.
Getting your usage data
- Research
- Partly researched [source, unverified]
McMinnville Electric System (TN). One search: only a 2011 Nexgrid C&I contract press release (see meter_deployments); no utility meter page or usage portal found. Light pass; secondary leads (Tennessee Magazine, TVA) not checked.
Meter types over time
Counties served
Tennessee: Warren
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.