Utility Brain

City of Port Angeles - (WA)

Municipal utilityWashingtonWebsite ↗

Customers (2025)
11,138
Meters
11,138
Smart meters (AMI)
0 (0%)
Grid region
WECC
EIA utility number
15231

Counts: EIA Form 861, data year 2025.

Meters installed

Vendor not knownCurrent

Manual reads · since 2014 [source, unverified]

After the 2014 Mueller settlement the city may keep replacing old meters only with models lacking the smart-meter (communicating) components; no later AMI found. EIA reports no AMR/AMI since 2013. Re-checked 2026-11-16: PDN 2014-10-22 (read) confirms the settlement ($759,891 reimbursement funds new electric meters to replace old, outmoded ones; Mueller took back the electric meters with the wireless devices) but does not say the replacements lack communicating parts; no later city meter program found (one search). Non-communicating status rests on the earlier snippet and EIA.

Mueller Systems, LLCReplaced

2011–2014 · Part of the territory [source]

Mueller Systems $4.9M AMI contract (Dec 2010) for 10,600 electric and 8,500 water meters, installs from June 2011 (Olympic Electric), wireless + fiber, load control pilot; system failed to deliver reads, 2014 settlement: Mueller took back installed and warehoused electric meters.

Getting your usage data

Pair a device to the meter
None
Meter radio readable with an SDR
No
Research
Researched [source, unverified]

Electric meters are non-communicating since the failed Mueller AMI (2011-2014); the Mueller system briefly let customers track daily use and had a peak-demand load control program. Website taken from general knowledge, not fetched; portal and opt-out not researched further (no AMI to opt out of). Re-checked 2026-11-16: no newer primary source on Port Angeles meters or a portal found (one search; only 2014-2019 PDN coverage).

Meter types over time

0%50%100%2013: AMI 20%, AMR 0% of 10,745 meters'132014: AMI 0%, AMR 0% of 11,646 meters'142015: AMI 0%, AMR 0% of 11,713 meters'152016: AMI 0%, AMR 0% of 11,361 meters'162017: AMI 0%, AMR 0% of 11,811 meters'172018: AMI 0%, AMR 0% of 10,971 meters'182019: AMI 0%, AMR 0% of 10,999 meters'192020: AMI 0%, AMR 0% of 11,835 meters'202021: AMI 0%, AMR 0% of 11,864 meters'212022: AMI 0%, AMR 0% of 11,865 meters'222023: AMI 0%, AMR 0% of 11,018 meters'232024: AMI 0%, AMR 0% of 11,028 meters'242025: AMI 0%, AMR 0% of 11,138 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersCity of Port Angeles - (WA). Source: EIA Form 861.

Counties served

Washington: Clallam

EIA lists a county when the utility serves any part of it.

Get live readings from your own meter

We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.

We only use this to tell you about Utility Brain. Privacy.