Utility Brain

City of Fort Collins - (CO)

Municipal utilityColoradoWebsite ↗

Customers (2025)
80,929
Meters
80,929
Smart meters (AMI)
80,791 (100%)
Meters with a home-area network
269
Customers with daily online usage
80,791
Grid region
WECC
EIA utility number
6604

Counts: EIA Form 861, data year 2025.

Meters installed

Elster Solutions· Elster / Honeywell EnergyAxis (EA_MS)Current

RF mesh · since 2012 · 85,328 meters [source]

Advanced Meter Fort Collins (ARRA SGIG Front Range Smart Grid Cities, with Fountain): 85,328 advanced meters across Fort Collins and Fountain (DOE), electric and water; Elster EnergyAxis on Tropos GridCom backhaul; Siemens eMeter EnergyIP MDMS; installation began March 2012, >95% by mid-2014 (T&D World). DOE summary lists point-to-point radio meter communications. Vendor from a T&D World search snippet. Verified 2026-11-16: the Elster/Tropos release of 2011-09-15 (T&D World reprint, fetched) confirms Elster EnergyAxis AMI for Fort Collins electric and water customers, Tropos wireless backhaul, about 100,000 electric and water endpoints, completion planned by end of Q2 2013 (eMeter not named there).

Getting your usage data

Online account
www.fcgov.com
Interval you can see
Daily
Green Button
Connect My Data connect
Apps that can connect
UtilityAPI, Green Button CMD
Pair a device to the meter
Not stated
Meter radio readable with an SDR
No
Smart meter opt-out
Allowed, with a fee ($11)
Research
Researched [source, unverified]

Green Button Alliance (2021-04-12): MyData, powered by UtilityAPI, launched Nov 2020, lets customers share energy and water data with authorized third parties via Green Button Connect My Data. Portal: MyEnergy (fcgov.com/myenergy, separate registration; customer handout, search snippet) / Monitor My Use: daily, monthly, annual energy and water use (bill brochure snippet); Nectar Climate (secondary) says 15-minute data and that the UtilityAPI route is being deprecated. Opt-out: manual read for a monthly fee, property owner approval (city smart meter page snippet; amount not found). SGIG offered in-home displays and PCTs (han program status not stated). Re-checked 2026-11-16: the city service-charge page (search snippet; the page now redirects to fortcollins.gov without the fee table) lists a manual meter reading charge of $11.00 per month for accounts after advanced meter installation, property-owner approval required, possible meter exchange fee under Municipal Code 26-712(b); opt_out_fee_usd 11 is that monthly charge. Portal interval still daily from snippets.

Meter types over time

0%50%100%2013: AMI 98%, AMR 0% of 68,737 meters'132014: AMI 98%, AMR 0% of 69,146 meters'142015: AMI 99%, AMR 0% of 70,171 meters'152016: AMI 100%, AMR 0% of 70,533 meters'162017: AMI 100%, AMR 0% of 72,127 meters'172018: AMI 100%, AMR 0% of 74,177 meters'182019: AMI 100%, AMR 0% of 75,245 meters'192020: AMI 100%, AMR 0% of 76,417 meters'202021: AMI 100%, AMR 0% of 77,284 meters'212022: AMI 100%, AMR 0% of 78,045 meters'222023: AMI 100%, AMR 0% of 78,634 meters'232024: AMI 100%, AMR 0% of 79,585 meters'242025: AMI 100%, AMR 0% of 80,929 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersCity of Fort Collins - (CO). Source: EIA Form 861.

Counties served

Colorado: Larimer

EIA lists a county when the utility serves any part of it.

Get live readings from your own meter

We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.

We only use this to tell you about Utility Brain. Privacy.